Capital Projects

In order to build, renovate, or maintain campus buildings and infrastructure, all state agencies are dependent on state funds allocated for that purpose.  Lake Washington Institute of Technology (³Ô¹ÏºÚÁÏÍø) submits requests for funding to the  (SBCTC). These requests are made during the current biennium (a specified period of two years) for the next biennium on a strict calendar. A great deal of work goes into preparing a capital request. 

Current Projects

  • Center For Design - $38,739,504.00
  • Permit received from City of Kirkland November 2023
  • Center for Design Construction page coming soon
  • Early Learning Center - $4,600,000.00
  • Working with SWL Architects to finalize the layout/design
  • Dental Clinic (Large Lab) - $692,000.00 (Phase II)
  • Phase II of the Large Dental clinic project is to renovate and revitalize the flooring in the main clinic area and the sterilization lab.
  • Aiming for Summer 2024 construction timeframe
  • 2024-193 Welding Ventilation and Hood System - $250,000.00
  • Waiting on cost estimates
  • 2024-192 AC Unit replacement or server room  - $100,000.00
  • Waiting on cost estimates
  • 2024-248 Obsolete Fire Panel replacements - $264,000.00
  • Waiting on cost estimates
  • Electrical Volt Replacement - $25,000.00
  • Gas Meter replacement  - $27,000.00
  • Primary Switchgear replacement - $37,000.00
  • Repair an Emergency Generator - $41,000.00
  • Replace potable Water meters - $59,000.00
  • Replace failing Toilet Anchors - $80,000.00
  • Recondition areas of East Building Roof - $83,000.00
  • Resurface/Recondition West Building Bridge - $143,000.00
  • Replace three (3) set of Concrete stairs - $197,000.00
  • Replace Overhead Door - $280,000.00
  • Replace Storm lines - $885,000.00

Total Spend on 2023-25 Capital Project (Including projects w/Grants) $46,502,504.00