Capital Projects
In order to build, renovate, or maintain campus buildings and infrastructure, all state agencies are dependent on state funds allocated for that purpose. Lake Washington Institute of Technology (³Ô¹ÏºÚÁÏÍø) submits requests for funding to the (SBCTC). These requests are made during the current biennium (a specified period of two years) for the next biennium on a strict calendar. A great deal of work goes into preparing a capital request.
Current Projects
- Center For Design - $38,739,504.00
- Permit received from City of Kirkland November 2023
- Center for Design Construction page coming soon
- Early Learning Center - $4,600,000.00
- Working with SWL Architects to finalize the layout/design
- Dental Clinic (Large Lab) - $692,000.00 (Phase II)
- Phase II of the Large Dental clinic project is to renovate and revitalize the flooring in the main clinic area and the sterilization lab.
- Aiming for Summer 2024 construction timeframe
- 2024-193 Welding Ventilation and Hood System - $250,000.00
- Waiting on cost estimates
- 2024-192 AC Unit replacement or server room - $100,000.00
- Waiting on cost estimates
- 2024-248 Obsolete Fire Panel replacements - $264,000.00
- Waiting on cost estimates
- Electrical Volt Replacement - $25,000.00
- Gas Meter replacement - $27,000.00
- Primary Switchgear replacement - $37,000.00
- Repair an Emergency Generator - $41,000.00
- Replace potable Water meters - $59,000.00
- Replace failing Toilet Anchors - $80,000.00
- Recondition areas of East Building Roof - $83,000.00
- Resurface/Recondition West Building Bridge - $143,000.00
- Replace three (3) set of Concrete stairs - $197,000.00
- Replace Overhead Door - $280,000.00
- Replace Storm lines - $885,000.00
Total Spend on 2023-25 Capital Project (Including projects w/Grants) $46,502,504.00